Leave a Message

By providing your contact information to John Zimmerman, your personal information will be processed in accordance with John Zimmerman's Privacy Policy. By checking the box(es) below, you consent to receive communications regarding your real estate inquiries and related marketing and promotional updates in the manner selected by you. For SMS text messages, message frequency varies. Message and data rates may apply. You may opt out of receiving further communications from John Zimmerman at any time. To opt out of receiving SMS text messages, reply STOP to unsubscribe.

Thank you for your message. We will be in touch with you shortly.

Blog

Westside Village's First Door Opens Onto the River, Not University Drive

"The Levee Porch will be a laid-back, fast casual hideaway that will be a ton of fun for the family and a perfect place for a biker or kayaker to come down the trail and find an oasis on the West Fork of the Trinity," Kyle Wright told Fort Worth Inc. in August.

Wright owns and operates Chimy's, and the customers he describes arrive by bike or by boat. The $1.7 billion Westside Village is a 37-acre district planned along the West Fork, and Levee Porch is one of its first two named tenants. The project's first finished public space is aimed at the river, the trail and the bank across from it, the same bank that Crestwood's own trailhead sits on.

A 2,500-Square-Foot Building in Front of a 37-Acre Plan

Most of Westside Village is still a construction site. Fort Worth Inc. described "that immense hole in the ground at University and Westside Drive," on the site of the former Fort Worth ISD administration building, as Phase 1. Construction has been visible above grade since then. On September 10, the project's structural engineers posted a progress update ahead of an elevated-deck concrete pour and said the seven-story podium apartment building was taking shape.

The riverfront piece is on its own track. A state accessibility filing with the Texas Department of Licensing and Regulation lists "Tailwaters and Levee Porch" as a new 2,500-square-foot building at 2828 Shamrock Avenue, with an estimated construction cost of $1,000,000. Set that next to the rest of the plan and the order of the project becomes clear.

Piece of Westside Village Size Published timing
Levee Porch and Tailwaters Fly Fishing Co. 2,500-square-foot building Expected first quarter of 2027
Phase I office building 100,000 square feet, Class AA, with ground-floor retail, two restaurant concepts and a private social club Office ready for tenant buildouts "next fall," per Fort Worth Inc. in August 2026
Phase I residential building Seven-story podium building; 308 units in the March groundbreaking announcement About a year after the office, per Fort Worth Inc.
Full buildout 37 acres; 880,000 square feet of office, 238,000 square feet of retail, a boutique hotel and 1,785 apartments Planned for 2035

The smallest building in the plan is first in line. Everything bigger opens later.

What the Porch Is Built to Hold

The floor plan matches Wright's description. Fort Worth Inc. reported the program like this:

  • Tailwaters Fly Fishing Co.: nearly 1,500 square feet of retail space
  • Levee Porch bar: about 400 square feet
  • Covered porch: about 500 square feet, with a walk-up bar window
  • Beer garden: set below the porch and shaded by live oak trees

Indoors, the bar is about the size of a large living room. The walk-up window and the beer garden carry most of the seating, so the venue is built mainly for outdoor use. The menu is food you can eat with one hand: burgers, hot dogs, cheesesteaks and Cubans, plus beer, mojitos and margaritas. Fort Worth Report noted that these are familiar Chimy's staples. Fort Worth Inc. reported that the venue is meant to serve both casual diners and people out using the river area.

The planned events point the same way. The plans list fly-fishing film tours, fun runs and casting competitions. All three need open ground or water, and a fun run needs a trail. Fort Worth Report described Levee Porch as the "recreational anchor" of the 37-acre development, meant to help bring activity to Fort Worth's riverfront.

Who Is Behind the Counter

The operators are known Fort Worth names. Levee Porch comes from Wright and Jason Finley, general manager of Chimy's Fort Worth. The shop attached to it is a Fort Worth outpost of Tailwaters Fly Fishing Co., which is co-owned by David Leake and Neil Turner.

Tailwaters was founded in Dallas in 2007 and works as a fly-fishing outfitter, retail shop and travel agency for angling trips. The Fort Worth location will be its second store. Leake told Fort Worth Inc. the company had often thought about a second store but "could never find the right location, synergy, or deal that made sense," and said: "It is only fitting that we enter our 20th year in business with a new location in Fort Worth, on the West Fork of the Trinity."

A fly shop chose a riverbank over a retail corridor, and a restaurant group placed its porch where trail traffic passes. Both choices assume that people will reach this site from the water side first.

The design and construction team behind the building, as Fort Worth Report listed it: Line Design led the design, RSDG is the architect, ARCO/Murray is building it, and Austin Schenkel and Emmy Kate Barr of Duwest are handling leasing for the development.

Why the River Side Opens First

The order follows from how the developer thinks about the site. Carl Anderson, president of Larkspur Capital, told Fort Worth Inc. that the Trinity River and its trail system "will be integral to the identity and long-term success of the project." He also said the site offers "a rare opportunity to make the river a destination and the backbone of the neighborhood rather than its edge." In practice, he said, that means turning the district toward the water, building strong pedestrian connections to the trail system and adding a kayak launch.

The towers will take much longer. In August, Fort Worth Inc. reported that Phase 1 is "slated to be open by the end of 2030." The same paragraph said the office portion would be ready for tenant buildouts "next fall" and that the apartments would take another year. In September 2025, Multifamily & Affordable Housing Business put Phase I completion in 2028. Those published dates don't agree, but they lead to the same conclusion. The office building, the jazz club and the apartments are at least a year or two away. The porch and the fly shop are expected in the first quarter of 2027.

The porch's own schedule also deserves some caution. The state filing gave an estimated construction completion date of October 15, 2026, and that date has passed. The record's status still reads "Project Registered." The most recent public timing for the opening remains the first quarter of 2027, as reported in June and again in August.

The Crestwood Side of the Water

Here is what that means north of the West Fork. The Trinity Trails map published by the Tarrant Regional Water District lists the Crestwood trailhead at 3698 Rockwood Park Drive and the White Settlement trailhead at 4570 White Settlement Road. Westside Village says it will connect to the Upper West Fork trail system so people can arrive on foot, by bike or by transit.

The crossings that would tie the two banks together more directly are still plans. The water district's recreation plan, presented to its board in January 2025, lists a "Bridge Connection at Crestwood" in its Brookside Nature Area project with a mid-term timeframe. It also lists a "Bridge Crossing at University Drive" in its long-term Reimagined Rockwood Park project. The same plan says the current trail trip between the Ohio Garden trailhead and Crestwood Park is 3 miles, with "limited access and challenging terrain." A new concrete segment and a river-crossing bridge there would cut that trip to less than a quarter mile. None of these crossings has a construction date. Rockwood Park's own longer timeline under the flood-control program is covered in our post on the Coyote Drive-In and Rockwood Park.

The kayak launch is also still a plan. Fort Worth Inc. lists it under future plans at the Levee Porch site and credits the idea to Councilmember Elizabeth Beck.

So the opening sequence looks like this. In the first quarter of 2027, a covered porch, a walk-up window, a beer garden under live oaks and a fly shop of nearly 1,500 square feet are expected to open on the West Fork. Around them will be a construction site. The office and apartment buildings will rise behind them in 2027 and 2028 or later, depending on which published timeline holds. For Crestwood, the first finished part of the largest project at its back door faces the river, toward its side of the water. Our earlier look at what changed at Crestwood's back door in 2026 covered the groundbreaking. The porch is the first piece residents will be able to walk into.

We follow every opening date and trail plan on the West Fork, because these changes shape daily life in Crestwood and what its homes are worth. If you want to talk through what Westside Village's opening schedule means for your street, John Zimmerman and our team are glad to help. Work With Us.

John Zimmerman smiling in a gray checked blazer in front of built-in shelving

John Zimmerman

About The Author

What makes John Zimmerman the No. 1 agent in Fort Worth for the past half-decade? A relentless pursuit of excellence and dedication to providing the very best results for his clients across every price point. Innovation and hard work are not just taglines, but an obsessive pursuit that inspires fierce client loyalty. As the founding agent for Compass Real Estate’s Fort Worth office, Zimmerman is combining nearly 30 years of residential real estate experience with Compass's best-in-class data and technology to optimize the client experience.

Work With Us

As the founding agent for Compass Real Estate’s Fort Worth office, Zimmerman is combining nearly 30 years of residential real estate experience with Compass’ best-in-class data and technology to optimize the client experience.
Contact Us